Thermal Remediation Services Inc. Logo
Header Banner

Completed Project

ERH Pilot Test for Remediation of TCE DNAPL
U.S. Naval Air Station Dallas, Texas
Contaminants of Concern: TCE
Starting Contaminant Levels: DNAPL
Geology: Fill, clay, silt, and gravel
Hydrology: Groundwater at 6 feet bgs
Remediation Design Engineers: Mr. Greg Beyke, Mr. Jerry Wolf
Operations Manager: Mr. Jerry Wolf
Current Project Status: Presently at the initial design stage
Scheduled Completion Date: Summer 2003

TRS was retained to design, construct and operate an ERH pilot test at the Naval Air Station in Dallas, Texas (NAS). TRS is presently completing the design and preparing to mobilize our ERH specialty equipment to the site. Once the pilot test has been successfully completed, the treatment system will be expanded to remediate a larger area. The goal of the pilot test is a 99% reduction in TCE concentrations in soil and groundwater.
Home | Contact | Site Map | Links | FAQ’s | Employment | White Papers © 2006 Thermal Remediation Services. All Rights Reserved